{"id":85597,"date":"2022-10-19T12:07:01","date_gmt":"2022-10-19T12:07:01","guid":{"rendered":"https:\/\/mcunha.eu\/?p=85597"},"modified":"2022-10-19T12:07:01","modified_gmt":"2022-10-19T12:07:01","slug":"a-new-revolution-in-urban-mobility","status":"publish","type":"post","link":"https:\/\/mcunha.eu\/pt_PT\/2022\/10\/19\/a-new-revolution-in-urban-mobility\/","title":{"rendered":"A New Revolution in Urban Mobility"},"content":{"rendered":"<p>O Porto e Gaia, ainda mais ligados, por uma nova linha, que alarga horizontes, encurta dist\u00e2ncias e aproxima pessoas. Esta nova linha de metro &#8211; a linha Rubi, ter\u00e1 6,3 kms,, 8 esta\u00e7\u00f5es e uma NOVA PONTE sobre o Rio Douro, exclusiva a pe\u00f5es, bicicletas e metro, promovendo a sustentabilidade ambiental. Iniciar\u00e1 na Esta\u00e7\u00e3o da Boavista, faz a liga\u00e7\u00e3o ao Polo Universit\u00e1rio de Campo Alegre, e encontra a superf\u00edcie na encosta da Arr\u00e1bida, numa moderna e simples obra de arte e engenharia portuguesa, com a marca de Edgar Cardoso. Esta obra, que iniciar\u00e1 em 2023, com previs\u00e3o de 34 meses de execu\u00e7\u00e3o (2025) e 300 milh\u00f5es de euros de investimento do Plano de Recupera\u00e7\u00e3o e Resili\u00eancia, ir\u00e1 beneficiar amplamente o Litoral de Gaia, e reduzir a press\u00e3o do intenso tr\u00e1fego rodovi\u00e1rio, promovendo uma clara melhoria de qualidade de vida. Da Arr\u00e1bida, passar\u00e1 ao Candal &#8211; Polo Econ\u00f3mico e de liga\u00e7\u00e3o \u00e0s Caves, seguindo para a Esta\u00e7\u00e3o da Rotunda, com um parque subterr\u00e2neo para 500 lugares, Esta\u00e7\u00e3o de Devesas e o s\/interface com as linhas urbanas da C.P., Soares do Reis, acabando numa nova Esta\u00e7\u00e3o de Santo Ov\u00eddeo. E que letra foi escolhida para esta nova linha de metro?H!!! H de humanidade, de liga\u00e7\u00e3o, de servi\u00e7o aos 12 milh\u00f5es de utentes, com a S\/vida melhorada com este anel circular SUL. EM BOA HORA!!<\/p>\n<p>#porto #gaia #mobility #publicinvestment #sustentability #urbanismo #connectingpeople #metro<\/p>\n<p id=\"tw-target-text\" class=\"tw-data-text tw-text-large tw-ta\" dir=\"ltr\" data-placeholder=\"Tradu\u00e7\u00e3o\"><span class=\"Y2IQFc\" lang=\"en\">Porto and Gaia, even more connected, by a new line, which broadens horizons, shortens distances and brings people together. This new metro line &#8211; the Ruby line, will have 6.3 km, 8 stations and a NEW BRIDGE over the Douro River, exclusively for pedestrians, bicycles and metro, promoting environmental sustainability. It will start at the Boavista Station, connect to the Polo Universit\u00e1rio de Campo Alegre, and find the surface on the slope of Arr\u00e1bida, in a modern and simple work of Portuguese art and engineering, with the signature of Edgar Cardoso. This work, which will start in 2023, is expected to take 34 months to complete (2025) and 300 million euros of investment in the Recovery and Resilience Plan, will benefit the coast of Gaia, and reduce the pressure of the intense road, promoting a clear improvement in the quality of life.\u00a0 From Arr\u00e1bida, it will pass to Candal &#8211; Economic Hub connecting the cellars, heading to Station of Rotunda, with an underground park for 500 places, \u00a0to Station of Devesas and the interface with urban lines from CP &#8211; Trains. Soares do Reis, ending in a new Santo Ov\u00eddeo Station. And what letter was chosen for this new metro line? H!!! H of humanity, of connection, of service to the 12 million users, with there life improved with this SUL circular ring. IN GOOD TIME!!<\/span><\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>O Porto e Gaia, ainda mais ligados, por uma nova linha, que alarga horizontes, encurta dist\u00e2ncias e aproxima pessoas. Esta nova linha de metro &#8211; a linha Rubi, ter\u00e1 6,3 kms,, 8 esta\u00e7\u00f5es e uma NOVA PONTE sobre o Rio Douro, exclusiva a pe\u00f5es, bicicletas e metro, promovendo a sustentabilidade ambiental. Iniciar\u00e1 na Esta\u00e7\u00e3o da [&hellip;]<\/p>","protected":false},"author":3,"featured_media":85602,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-85597","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/mcunha.eu\/pt_PT\/wp-json\/wp\/v2\/posts\/85597","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mcunha.eu\/pt_PT\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mcunha.eu\/pt_PT\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mcunha.eu\/pt_PT\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/mcunha.eu\/pt_PT\/wp-json\/wp\/v2\/comments?post=85597"}],"version-history":[{"count":3,"href":"https:\/\/mcunha.eu\/pt_PT\/wp-json\/wp\/v2\/posts\/85597\/revisions"}],"predecessor-version":[{"id":85601,"href":"https:\/\/mcunha.eu\/pt_PT\/wp-json\/wp\/v2\/posts\/85597\/revisions\/85601"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mcunha.eu\/pt_PT\/wp-json\/wp\/v2\/media\/85602"}],"wp:attachment":[{"href":"https:\/\/mcunha.eu\/pt_PT\/wp-json\/wp\/v2\/media?parent=85597"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mcunha.eu\/pt_PT\/wp-json\/wp\/v2\/categories?post=85597"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mcunha.eu\/pt_PT\/wp-json\/wp\/v2\/tags?post=85597"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}